Rayan & Samir Consultation's

Inside an industrial zone — the lower-friction track

Factory License — Inside Industrial Zones

Industrial zones are pre-cleared on land use, environment, and core infrastructure, so the licensing path collapses to the operating license plus civil-defense approval. For most standard projects the realistic timeline is 30 to 60 days. The variance lives in risk classification under Law 15/2017 — low-risk activities run on the notification regime, higher-risk activities run on prior-approval.

Pending advisor validation

This page is sourced from public Egyptian regulatory references and our internal advisory notes. Our advisors are reviewing the specifics for final sign-off. Book a 30-minute call for advice tailored to your case.

Last sourced:

Book a 30-minute call

When this entity is right

Best for

  • Manufacturers committing to a GAFI-managed industrial zone (any region)

  • Low and moderate risk activities under Law 15/2017 classification

  • Projects that need a predictable 30–60 day timeline to operate

  • Investors who value pre-cleared environmental and land-use approvals

When something else fits better

Not for

Naming the cases this entity is wrong for is the whole point of an advisory call. The cross-links below go to the entity we would suggest instead.

Manufacturing on private land outside any industrial zone

If you already own land outside a zone — or the project economics need a non-zone location — the outside-zone track applies. It is materially heavier on documentation and runs 60–120 days.

See the outside-zone track →

Already in production — only the register is missing

If the factory is already operating and you need the industrial register certificate for customs, exports, or chamber membership, that is a separate filing with its own 30-day statutory window.

See the industrial register page →

Retail or commercial activity, not manufacturing

Shops, restaurants, and service businesses follow the commercial-shop licensing track instead of the industrial track.

See the shop license page →

Quick facts

Statutory minimum capital
Foreign ownership
100% (no nationality restriction on the licence holder)
Typical timeline
30–60 days standard

What you need to prepare

Document checklist

Items tagged Foreigner-specific need apostille, consular authentication, or sworn translation from your home jurisdiction. We send you a precise per-document brief before any Egyptian-side work begins.

Project — establishment & land

  • Possession instrument for the plot (lease or allocation deed from the zone)

  • Commercial register and tax card of the licence-holding company

  • Articles of association

  • Power of attorney to the local representative

    Foreigner-specific

    Apostilled and legalised at the Egyptian consulate in the home country. Must explicitly authorise licensing applications and signing before the licensing authorities.

Technical — engineering & safety

  • Engineering drawings (3 approved sets, stamped by a syndicate-registered engineer)

  • Civil-defense approval

  • Risk classification determination under Law 15/2017

  • Process-flow description and machinery list

Activity-specific overlays (where applicable)

  • Food-sector registration with the Food Safety Authority

    Required for any food, beverage, or food-contact manufacturing.

  • Pharmaceutical regulatory pre-approval (EDA)

    Required for pharmaceutical, cosmetic, and medical-device manufacturing.

  • Chemical-sector environmental sub-clearance

    Even inside a zone, certain chemical activities trigger additional EEAA review.

How the engagement runs

01

Discovery and risk classification

Free 30-minute call. We confirm the inside-zone track applies, classify the activity under Law 15/2017, and scope the civil-defense workload.

02

Advisory memo

Written memo with the licensing path, the realistic 30–60 day timeline, the authorities involved, and the document brief sized to your home jurisdiction.

03

Drawings and submission package

We coordinate with the engineering office on civil-defense-ready drawings, prepare the operating-license application package, and stage the civil-defense submission.

04

Civil defense and operating license

Civil defense submission, inspection, approval. Operating license (نموذج 1 س ص) issued. We track each authority's response on a weekly written update.

05

Production start and industrial register

On production start, the 30-day clock for the industrial register certificate begins. We file the register on day one so it never becomes a customs blocker.

06

Handover and renewal calendar

One-hour handover covering the five-year industrial-register cycle, civil-defense periodic inspections, and the go-forward compliance plan.

Engagement scope

What this engagement covers

We prepare a tailored proposal after reviewing your specifics — activity, shareholder structure, sector pre-approvals. The lists below describe what we typically own end-to-end versus what stays outside the engagement.

What we own end-to-end

  • Risk classification under Law 15/2017 (notification vs prior-approval regime)
  • Operating license application (نموذج 1 س ص) end-to-end
  • Coordination with the engineering office on civil-defense-ready drawings
  • Civil defense submission and follow-through to approval
  • Industrial Development Authority and zone-management interface
  • First-time industrial register certificate filing on production start

Outside this engagement

  • Government fees and zone-management charges (paid at cost)
  • Engineering office fees for the drawings themselves (introduced if needed)
  • Civil-defense suppression and detection hardware (installed by a specialist contractor)
  • Zone lease or land allocation — handled by you with GAFI before the licensing engagement begins
  • Sector-specific pre-approvals (food, pharma, chemical, heavy industry)

Common questions

What foreign investors ask us

The questions below come up on almost every discovery call for this entity. If yours isn't here, bring it to the call.

Tell us where the zone is and what you're building.

30 minutes. English. No obligation. We will not push the inside-zone track if the outside-zone economics are stronger for your case.

Book a consultation